ExxonMobil and its joint-venture partners have sanctioned a $4 billion final investment decision to redevelop the mature Kizomba A and Kizomba B oilfields in Angola’s offshore Block 15.
Angola’s National Oil, Gas and Biofuels Agency (ANPG) announced the milestone on Friday, confirming the partners formalized the multi-billion-dollar commitment on Thursday to extend output across the deepwater hub.
The capital injection builds on the 2025 approval of the Kizomba C redevelopment, leveraging existing floating production infrastructure to unlock additional hydrocarbon reserves across the broader Kizomba pole.
ExxonMobil subsidiary Esso Exploration Angola (Block 15) Limited operates the block with a 36% stake, alongside Azule Energy at 42%, Equinor at 12%, and state-owned Sonangol E&P holding 10%.
Located roughly 145 kilometers off Angola’s northern coast, Block 15 has produced more than 2.7 billion barrels of crude since 2003, with Kizomba A and B starting operations in 2004 and 2005.
The sanction follows a July 2025 Production Sharing Contract extension through 2037, alongside recent drilling momentum at the Tchihumba West-01ST1 well, marking Block 15’s 21st discovery and second find in 2026.
Angola’s Presidential Decree 8/24 catalyzed the brownfield resurgence by introducing lower tax rates and improved cost recovery for incremental output from mature deepwater fields.
Similar fiscal incentives across Sub-Saharan Africa—including Nigeria’s Petroleum Industry Act and 2024 executive orders that unlocked the $5 billion Bonga North project—are intensifying regional competition for upstream capital.
For Luanda, sustaining Block 15’s output is vital to arresting natural field decline and keeping national crude production above 1 million barrels per day following its 2023 OPEC exit.







